China National Electric Wire & Cable Imp./Exp. Corp.

Google

108.25MW Used Gas Turbine Power Plant for Sale from China

 

As a leading Chinese power plant EPC contractor and supplier, we have been offering EPC contracting services from China to the world market for more than 20 years. The business scopes include power plant equipments supplying, erection, installation, commissioning, training, spare part supply, operation and maintenance.

 

1. General Introduction

The Plant was put into production in 1990, and now has a operation time of about 40000 hours, it is served with good maintenance and still in very excellent condition.

 

Here we have a 108MW used gas turbine power plant in store for sale. The Plant was supplied and installed by John Brown Engineering Ltd. from English as EPC, other equipments were supplied by German, Japan, Holland, with the most advanced technology for the 80-90’s. The gas turbine driven power plant is of combined cycle type with heat conversion rate at 45%.

 

The equipments for sale include the whole set of power plant: natural gas purification station, two units of 9 stage central centrifugal natural gas booster and auxiliaries, two units of gas turbine and auxiliaries, two units of waste heat recovery boiler and auxiliaries, one unit of steam turbine generator, three sets main transformer and station transformer, combined distribution system and 110KV step up substation, and domestic chemical treatment system, whole power plant and station control systems.

 

2. Main Technical Data:

Gas Turbine:

 2 unit

Manufacturer

John Brown, England

Series

MS6001-B Type,

Type

PG6541-B

Starting

Motor

Output

Single cycle: 3675KW

 

Combined Cycle: 36650KW

Control System

No: 1, and 2 unit, by TS3000 digital control system

Protection

Over: speed, temperature, vibration, stop

 

 

Silencer

Intake and exhaust silencers

Critical RPM

First stage: 1653-1877Rpm (34+-1% SPD)

 

Second stage: 3256-3980Rpm (69.5+-6.5%SPD)

Revolving direction

Counterclockwise (from view of intake)

Fuel

Natural gas 11833Square NM per Hour

Single cycle

Efficiency: 31.3%

Combined cycle

Efficiency: 45%

Heat

11486KJ/KW.H

 

 

Generator

 3 sets

Type

BDAX 7-265 ERH

Output

48.488MVA

Voltage

10.5KV

Rated Current

2556A

Frequency

50HZ

Power factor

0.8

Speed

3000 RPM

Insulating Class

F/F

Excitor

Alternative Brushless BX530-32

 

 

Recovery Boiler

 2 sets

Manufacturer

Standard Fasel

Specification

 Waste heat recovery boiler 63.75-40/455

 

 

Steam Turbine

 1 set

Manufacturer

Mitsubishi, Japan

Type

10CL-16, Single cylinder, condensing, axial exhaust

Output

37500KW, Max. 37500KW

Main intake pressure

4020 KPaA

Main intake temp.

450 C degree

Speed

3000Rpm

Exhaust pressure

49.3mmHG

Revolting direction

Counterclockwise (from generator view)

stages

16

 

3. Preliminary Quotation for the whole power plant: EXW China 18 millions USD (complete power plant excluding dismantle, transportation, packing, erection etc.)

 

For more detail of used above power plant please email ccclb@sina.com