|
China National Electric Wire & Cable Import & Export Corp. |
|
Quality, Efficient and Cost |

|
|
|
China National Electric Wire & Cable Imp./Exp. Corp. (CNEW), established in 1981 by former Ministry of Machinery Industry. Now she is one of 50 subsidiaries of Sinomach (http://www.sinomach.com.cn/en/). CNEW is the main arm of Sinomach in electric equipment supplier to overseas market. 20 years ago CNEW entered into turnkey or EPC project market, up to now CNEW has completed more than 2000km transmission line project up to 500kV, 80 Nos. sub-station up to 220kV, more than 1000km underground cable projects up to 220kV in overseas market. Now CNEW enters into power plant market and contracted for geothermal power plant in Indonesia and coal fire power plant in Mongolia. A. Electrical And Mechanical Equipment Supplier to World Market Besides wire and cable, we are main supplier of electrical equipments ◆ Transmission Line Material And Equipment, such as steel tower, hardware, Glass Insulator, porcelain Insulator, Composite Insulator, Oil-impregnated Paper Condenser Type Transformer Bushing, Wall Bushing ◆ Sub Station Equipment And System, such as power transformer, voltage transformer, current transformer, electrical panels, DC battery, DC charger, metering system, bushing, switchgear, electronic kwh meter, pre-paid meter, ◆ Electric Power Generation Equipment And System, such as Boiler, Steam Turbine, condenser, demister, water ring pump, pump, steam jet, water jet, generator, DCS and related measuring control instruments, ◆ Machine for Heavy Industry And Light Industry, such as paper machine, Diesel and Diesel Generation System. B, EPC, Turnkey Power Contractor ◆ Electrical Power Station Project up to 150MW. With CNEW’s engineering team we focus on small capacity power plant up to 150MW unit size including geothermal power station, diesel power station. ◆ Geothermal Power Plant CNEW paid great attention in green energy and recyclable energy. . A 2x6MW geothermal power plant EPC contract was signed in 2005 and we are aiming Waste Heat Recovery Power Plant for cement factory. ◆ Electric Transmission Line Project up to 500kV. During last 20 years CNEW have completed electric transmission line more than 2000km overhead transmission line and on turnkey or EPC basis on overseas markets. ◆ Sub Station Project Up to 220kV. CNEW have completed 80 Nos. substation on turnkey basis or EPC basis on overseas markets. ◆ Underground Cable Project. CNEW contracted first 132kV oil filled cable project with KESCO of Pakistan in 1993. Since then CNEW completed 132kV and 220kV oil filled cable projects in Egypt, Cyprus, Bahrain and Kuwait. Along with XLPE cable technology development CNEW entered into underground XLPE cable project in 2001.
|